Home Additions
Room additions, primary suites, second stories, garages and covered outdoor rooms — designed to tie into your existing home structurally, mechanically and visually.
An addition is part new construction and part renovation. The new structure has to meet today's code while connecting to a house that may have been built decades ago. We start by checking what your lot allows — setbacks, lot coverage, flood rules — and what the existing structure can carry, so the design is buildable before you pay for full drawings.
What's included
Ground-floor additions
Bedrooms, family rooms and primary suites on new foundations tied to the existing home.
Second-story additions
Upper floors where the existing walls and foundation can be engineered to carry the load.
Garages & conversions
New garages, carports, or converting an existing garage into finished living space.
Covered outdoor rooms
Roofed patios, summer kitchens and screened rooms that are permitted and built to wind code.
Mechanical tie-ins
Extending or upsizing HVAC, electrical service and plumbing to serve the new space.
Seamless finishes
Rooflines, stucco, flooring and trim matched so the addition looks like it was always there.
How the project runs
- 01
Feasibility check
Survey, zoning setbacks, flood zone and a look at the existing structure to confirm what can be built.
- 02
Design & engineering
Drawings and structural engineering prepared and reviewed for cost before permit submission.
- 03
Permit & build
Permit approval, then foundation, structure, dry-in and tie-in to the existing house.
- 04
Finish & final
Interior finishes, final inspections and closeout of the permit.
Before you plan an addition
- Setbacks & lot coverage
- Local zoning limits how close you can build to property lines and how much of the lot can be covered.
- The 50% flood rule
- In flood zones, if improvement costs reach half the home's market value, the whole house may need to meet current flood standards.
- Living at home during work
- We plan dust control, access and the timing of the tie-in so the house stays livable as long as possible.
FAQ
Home Additions: common questions
Can my house support a second story?
Sometimes. A structural engineer has to evaluate the existing foundation and walls. We arrange that review early so you know before investing in full design.
Do home additions need a permit in Florida?
Yes. Additions require a building permit with drawings, and usually separate electrical, plumbing and mechanical permits. We handle all of them.
Will the addition match my house?
That is the goal from the first drawing. We match roof pitch, stucco texture, window style and interior finishes so the addition reads as part of the original home.
Related services
Whole-Home Renovation
Older homes brought up to date: new layout, systems, finishes and storm protection.
Learn moreKitchen & Bathroom Remodeling
Kitchens and baths rebuilt properly, from layout changes to waterproofing and finishes.
Learn moreCustom Homes & New Construction
Ground-up homes on your lot, from permit drawings to certificate of occupancy.
Learn more
Free estimate
Tell us what you want to build
Send a few details and a licensed contractor will call you back, usually within one business day. We'll talk through scope, permits and a realistic budget range — no pressure and no obligation.